Wind has been around a long time! Since ancient times, people
have harnessed the winds energy. Over
5,000 years ago, the ancient Egyptians used wind to sail ships on the
Nile River. Later, people built windmills to grind wheat and other
grains. The earliest known windmills were in Persia (Iran). These early
windmills looked like large paddle wheels. Centuries later, the people
of Holland improved the basic design of the windmill. They gave it
propeller-type blades, still made with sails. Holland is famous for its
windmills.
American colonists used windmills to grind wheat and corn, to pump water, and to cut wood at sawmills. As late as the 1920s, Americans used small windmills to generate electricity in rural areas without electric service. When power lines began to transport electricity to rural areas in the 1930s, local windmills were used less and less, though they can still be seen on some Western ranches.
The oil shortages of the 1970s changed the energy picture for the country and the world. It created an interest in alternative energy sources, paving the way for the re-entry of the windmill to generate electricity. In the early 1980s wind energy really took off in California, partly because of state policies that encouraged renewable energy sources. Support for wind development has since spread to other states, but California still produces more than twice as much wind energy as any other state.
Like old fashioned windmills, today's wind machines use blades to collect the winds kinetic energy. Windmills work because they slow down the speed of the wind. The wind flows over the airfoil shaped blades causing lift, like the effect on airplane wings, causing them to turn. The blades are connected to a drive shaft that turns an electric generator to produce electricity.
With the new wind machines, there is still the problem of what to do
when the wind isn't blowing. At those times, other types of power
plants must be used to make electricity.
The December 17, 2009 Planning Commission Work Session deals with
Wind and the standards for approving wind projects in Umatilla
County. Below are the applicable materials:
October 22,
2009 Planning Commission Work Session Agenda (#7)
AOC Wind Energy Task Force Final Draft
Guidelines, November 2, 2009
Wind Energy Impacts - Summary of Work
Session issues
Oregon
Columbia Plateau Energy on Wind Energy Siting and Permitting Guidelines
September 29, 2008
Presentations given at the October 22, 2009 PC Work Session are in
PDF format:

Wind
Power Development Fish Concerns 10-09 by Gary James, CTUIR.

Wind Power Siting Considerations 10-22-09 by UBWC
Umatilla
County Wind Power - Wildlife Considerations, ODFW
Planning Commission Work Session, Thursday February 25, 2010 at 6:30 PM to be held at the Umatilla County Justice Center, Media Room, 4700 Pioneer Place, Pendleton, Oregon 97801. The following are the items from the Planning Commission packet for your review.
Planning
Commission Work Session Agenda 2-25-10
Summary of Measure 49 properties in Umatilla County
Review and Discussion of HB 2229
Umatilla County has many existing wind projects that have been
developed over the past 10 + years. with many more in the wings.
The approval process for wind energy projects and associated
transmission lines is outlined in the materials below.
Wind Energy Map (Revision: 1-20-10) showing current wind projects, met towers and other features of Umatilla County, Oregon.